


Ok so at this point we are a little overjoyed at what has been done! We have insulated all the walls. Drywall has gone UP. The overhead power line has come down. We have POWER inside! The jetted tub is in place and working (for the second time; the first tub had a few leaks and is now thrown outside in the snow). The shower and floors are ready for tile. The heating and air are in place, but not working yet, that






MY SON BIT ME! AND I HAVE THE MARK TO PROVE IT!
OK, SO MAYBE I ASKED FOR IT...WE WERE ROUGH HOUSING, AND PLAYIN', I PRETENDED THAT I WAS EATING HIS LEG, AND SAID, THAT IT TASTED LIKE CHICKEN YUMM....WELL, HE WANTED TO SEE IF I TASTED LIKE CHICKEN TOO I GUESS. HE BIT ME. ON THE BACK. IT BROKE THE SKIN. THAT MARK IS ABOUT THE SIZE OF A QUARTER. IT HURTS. I DONT PLAY LIKE I AM EATING ANYTHING ANYMORE.
Well, another successful day! John and Robert came over for a fun filled day of buildin'. all the framing is done on the inside, and the roof looks like a roof. all the in between work from part 16 was sheeting on the outside, the rest of the framing with the bathroom, and windows; we had to drill 6 1/2 inch bolts from our bottom plate down into the concrete every 24 inches. those bolts got a 3 inch square washer along with them.
the heat is on now....not really, summer is over, and there is a change in the air. all i can hope is to have all the outside done before it gets too cold out.



