Tuesday, September 16, 2008

PART 26, SEPTEMBER 15, 2008

CARPET IS IN! AND WE ARE LOVING IT!

Saturday, September 06, 2008

"EXTRA PROJECTS"

YOU EVER START DOING SOMETHING, AND IN THE BACK OF YOUR MIND THINK....GEE, MAYBE I SHOULDN'T BE DOING THIS RIGHT NOW.....OR......OH IT IS A SMALL PROJECT, IT WONT TAKE LONG....I THOUGHT BOTH THOSE THINGS AS I STARTED THIS LITTLE JEM....
THE IDEA WHAT THAT I WOULD CHANGE THE TILE IN ONE OF THE BATHROOMS. IT ENDED UP THAT WATER HAS BEEN LEAKING BEHIND THE TILE FOR YEARS...AND YEARS...AND YEARS. SO IT ALL CAME OUT. AND I FIGURED SINCE I WAS GOING ALL OUT ON IT, I MIGHT AS WELL REPLACE THE AGEING TUB TOO. IT HAD TO COME OUT IN 2 PARTS.
ANSON BECAME EXTREMELY UPSET TO SEE THAT HIS SPIDERMAN BATHROOM WAS "BROKEN"



PART 25, SEPTEMBER 6, 2006

THE "WOOD" FLOOR HAS BEEN PUT DOWN, THE RAILING HAS BEEN INSTALLED, AND THE ENTERTAINMENT CENTER HAS BEEN FINISHED. THE KIDS HAVE BEEN RUNNING ALL OVER THE PLACE HAVING FUN NOW THAT IT IS SAFE FOR THEM TO DO SO.


part 24, ssptember 6, 2006




Trim is up.

Part 23, September 06, 2008




Well, we got all the wood for the trim sanded, cut and an edge put on it. it all then got numbered on the back. all the wood then got a spray of sanding sealer, and 2 sprays of finish. it had to sit in this trailer to dry in between coats.